The instruments were warming up. Liquid nitrogen exhausted, cooling interrupted by loss of power, the cryogenic dewars had begun to warm. Recovering instruments takes many days of vacuum pumps and re-cooling to restore function if cooling has been loss. Other problems caused by the storm and power outages plagued the summit, some systems not responding to remote queries.
On Friday, the crew had abandoned early in the day in the face of deteriorating weather conditions. With the storm raging, no one had made it to the summit on Saturday. We all watched as remote weather instruments reported sustained winds of over 100mph and gusts as high as 134mph. With the wind came freezing fog, a thick coating of ice forming on every surface. The snowplow crews did not even try Saturday, it was just too dangerous.
Sunday offered at least a hope of making it to the summit. The storm had abated and beautiful sunny skies appeared over the summit. We readied for an attempt at the summit of Mauna Kea. As the engineer on call I would join the support techs at the summit. Maybe we could salvage something from the chaos.