
Category: Postcard from the Summit
Photos from the top
Screws
Purple Mountian
Spooled
Drills
Keys
Modding the HBS
Just checking to see if I got the wiring right. Some modifications to the telescope HBS, Hydraulic Bearing System, to allow for a slower startup. Some new hydraulic valves installed by Mark, a few new relays added by me, and the job is done. Hopefully less sputter and spitting on startup to keep the oil off the drive tracks. The system is a classic relay logic controlled setup, seriously old-school.

Whiffle Tree
Segment
On the Keck 2 Dome
During the morning meeting we discuss our plans for the day. This is done to coordinate activities, to insure we will not get in each other’s way during the day. This also lets everyone know if we are doing anything that might have a safety concern, so we can watch out for each other. With this last part in mind I noted that I would be climbing to the top of the Keck 2 dome.
After the meeting Denny approaches me. “Can I come?” he asks. Denny is our network manager, in charge of our computer systems, he has never had an opportunity, or reason, to climb the dome. The top of the dome is just a bit spectacular, and it is a beautiful day, I can not blame him for wanting to go.