
Tag: Keck
Mirror Cell
Screws
The Storm Continues
All day the storm atop our mountain continued. As we watched in the cameras the snow fell heavily, often so thick nearby structures disappeared into the white. Unlike yesterday the winds have eased, the snow quickly accumulates where it falls instead of drifting against the structures. As we watch through the day things began to vanish, railings and guardrails buried in the snow.

Observing is, of course, cancelled.
Spooled
Drills
Keys
Motor Current
Modding the HBS
Just checking to see if I got the wiring right. Some modifications to the telescope HBS, Hydraulic Bearing System, to allow for a slower startup. Some new hydraulic valves installed by Mark, a few new relays added by me, and the job is done. Hopefully less sputter and spitting on startup to keep the oil off the drive tracks. The system is a classic relay logic controlled setup, seriously old-school.







